Title: EVALUASI DESAIN STRUKTUR DAN WAKTU PELAKSANAAN PIER HEAD KANTILEVER (KONVENSIONAL) DENGAN PIER HEAD STRUKTUR BAJA HYBRID STASIUN TYPIKAL LRT PALEMBANG BERDASARKAN METODE KERJA (Studi Kasus)
Authors: SYAHPUTRA, HARVIEAN
Keywords: konstruksi layang, kantilever, pier head, struktur baja hybrid, bekisting, waktu, metode kerja
elevated construction, cantilever, pier head, steel structure hybrid Formworks, schedule, consruction method
Issue Date: 23-Oct-2023
Publisher: Fakultas Teknik, Universitas Islam Sumatera Utara
Series/Report no.: UISU230745;71210913117
Abstract: ABSTRAK EVALUASI DESAIN STRUKTUR DAN WAKTU PELAKSANAAN PIER HEAD KANTILEVER (KONVENSIONAL) DENGAN PIER HEAD STRUKTUR BAJA HYBRID STASIUN TYPIKAL LRT PALEMBANG BERDASARKAN METODE KERJA Harviean Syahputra 71210913117 Struktur beton bertulang masih menjadi pilihan utama sebagai elemen struktur di indonesia, tidak heran karena memiliki banyak kelebihan antara lain memiliki masa layan hingga puluhan tahun dan cenderung tidak memerlukan biaya besar dalam masa perawatanya, tetapi dikarenakan struktur beton bertulang memerlukan wadah cetakan (formworks system) pada saat pengecoran maka terkadang beton bertulang sulit untuk diaplikasikan terutama pada jenis konstruksi elevated di perkotaan. Oleh sebab itu pada project light rail transit (LRT) palembang-sumatera selatan pier head stasiun typikal lantai councourse menggunakan struktur baja (hybrid) dengan pertimbangan tidak menggangu kapasitas jalan (lalu lintas) pada saat proses pelaksanaan pekerjaan. Dalam penelitian ini bertujuan ingin mengetahui efek perubahan desain jika seandainya struktur pier head tersebut menggunakan struktur beton bertulang (konvensional) terhadap waktu penyelesaian dan metode kerja dengan try and error beberapa alternatif sistem metode bekisiting (formworks) yaitu: 1. Kantilever Penuh, 2. Kantilever semi penyangga, 3. Penyangga Penuh. Dengan hasil kedua metode kantilever cenderung tidak aman dan memerlukan profil balok baja yang besar, metode-3 (penyangga penuh) lebih aman untuk dikerjakan dan juga memiliki resiko kegagalan struktur yang rendah dengan persyaratan mampu melaksanakan mutu manajemen K3 yang baik, durasi waktu penyelesaian pekerjaan yang dibutuhkan (metode-3) relatif mampu menyesuaikan dengan pier head struktur baja hybrid (existing). Kata kunci : konstruksi layang, kantilever, pier head, struktur baja hybrid, bekisting, waktu, metode kerja ABSTRACK EVALUATION OF DESIGN STRUCTURE PIER HEAD STATION TYPICAL LRT PALEMBANG EXISTING USED STEEL STRUCTURE HYBRID TO CONCRETE STRUCTURE AGAINST TIMES SCHEDULES BASED ON METHOD STATEMENT Harviean Syahputra 71210913117 Reinforced concrete structures are still the top choice as structural elements in Indonesia, it's no wonder because they have many advantages, including having a service life of up to tens of years and tend not to require large costs for maintenance, but reinforced concrete structures require formwork systems while in casting, sometimes reinforced concrete is difficult to apply, especially in elevated construction types in urban areas. Therefore, in the Palembang-south Sumatra light rail transit (LRT) project, the typical pier head station concourse level uses a steel structure (hybrid) with the consideration that it does not interfere with road capacity (traffic) during the process. In this study the main purpose to figure it out the effect of design changes were previously used pier head steel structure hybrid to reinforced concrete structure on hightlight the impact of the completion time and the construction methods with try and error several alternative formwork systems: 1. Structure full cantilever, 2. Structure cantilever semi-shoring, 3. Structure full shoring. The results of both cantilever methods formworks system tending to be unsafe and requiring large steel beam profiles, method-3 (full shoring) is more safier to applicated and also has a low risk of structural failure with a conditions good implementation quality and safety management, the time required to finished (method-3) is relatively able to equal with the pier head steel structure hybrid (existing). Keywords : elevated construction, cantilever, pier head, steel structure hybrid Formworks, schedule, consruction method
URI: http://repository.uisu.ac.id/handle/123456789/2437
Appears in Collections:Teknik Sipil

Files in This Item:
File Description SizeFormat 
Cover,Bibliography.pdfCover, Bibliography3.25 MBAdobe PDFView/Open
Abstract.pdfAbstract12.26 kBAdobe PDFView/Open
Chapter I,II.pdfChapter I,II1.39 MBAdobe PDFView/Open
Chapter III,IV,V.pdf
  Restricted Access
Chapter III,IV,V5.3 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.