Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 31-40 of 84 (Search time: 0.001 seconds).
Item hits:
Issue DateTitleAuthor(s)
2022-10-21ANALISA KINERJA SIMPANG BERSINYAL JALAN SM.RAJA – JALAN PELANGI DAN JALAN TURI KECAMATAN MEDAN KOTA KOTA MEDANBATUBARA, ABDUL AZIS
2022-10-25PENGARUH ALIRAN AIR HUJAN TERHADAP DAERAH RAWAN LONGSOR BERBASIS SISTEM INFORMASI GEOGRAFIS ( SIG )PRASETYO, DANI
2022-10-25ANALISIS TINGKAT KEPUASAN PENGGUNA MODA TRANSPORTASI TRANS METRO DELI RUTE AMPLAS - LAPANGAN MERDEKA (STUDI KASUS)ALFANDI, AZMI
2022-10-25ANALISA DAYA DUKUNG PONDASI DALAM PADA PROYEK PEMBANGUNAN JEMBATAN GANTUNG KABUPATEN TOBA SAMOSIR PROVINSI SUMATERA UTARA (STUDI KASUS)YURIZA, FAIQAH VEBI
2022-10-21ANALISA VOLUME SEDIMENTASI KOLAM LUMPUR (SETTLING BASIN) PADA BENDUNG SUNGAI ULARNASUTION, ARY AFANDI
2022-10-21KORELASI NILAI CBR LABORATORIUM DAN DCP PADA TANAH YANG DIPADATKAN PADA PEMBANGUNAN JALAN TOL TEBING TINGGI – INDERAPURA (Studi Kasus)DAMANIK, ANNISA FADILA
2022-10-21ANALISA FAKTOR KEAMANAN PADA PEMBANGUNAN RETAINING WALL JEMBATAN KA-BH 39 LINTAS TEBING TINGGI – PEMANTANG SIANTAR (STUDY KASUS)MUCHTAR, ARIFIN
2022-10-25ANALISIS KINERJA PELAYANAN PELABUHAN PENYEBERANGAN LABUHAN BILIK – UJUNG TANJUNG SARANG ELANGSYAHPUTRA, EKO
2022-11-01ANALISIS KAPASITAS DAYA DUKUNG PONDASI TIANG PANCANG PADA PEMBANGUNAN GEDUNG FORTUNATE CITRA GRAND CITY PALEMBANG DENGAN MENGGUNAKAN METODE ANALITIS (Studi Kasus)AKBAR, FIRQIN HARIDHI
2022-10-25PERENCANAAN PERBAIKAN TANAH LUNAK MENGGUNAKAN METODE PRELOADING DAN PREFABRICATED VERTICAL DRAIN (PVD) PADA PROYEK PEMBANGUNAN JALAN TOL TRANS SUMATERA SEKSI TEBING TINGGI – INDERAPURA (STUDI KASUS)Utami, Feby Ingriyana